Engineered for strength, built for life.

Steel-framed homes and commercial buildings that go up 3–4× faster than block and timber, engineered to withstand winds beyond 180 mph and earthquakes beyond 8.0 on the Richter scale.

Move across the photo to see the structure underneath.

Steel doesn't rot, warp or feed termites, and a frame made in our shop goes up while the foundation cures.

A finished modular room being lifted into place by crane
3–4xfaster

than block and timber construction. A project that would normally take a year can be complete in 3 to 4 months.

180+mph winds

Every frame is engineered well past the 157 mph threshold of a Category 5 hurricane.

8.0+magnitude

Our steel frames are engineered to withstand earthquakes beyond 8.0 on the Richter scale.

Scroll to build a home in 14 weeks.

Everlast steel0%
Block and timber0%
Week0

    See how far an Everlast frame is built beyond the hurricane scale.

    Drag the slider through the Saffir-Simpson categories. Every Everlast frame is engineered to withstand winds of 180 mph and beyond.

    39mph
    Tropical storm

    141 mph below what an Everlast frame is built for.

    Everlast frames, 180+

    Categories follow the US National Hurricane Center's Saffir-Simpson scale for one-minute sustained winds. Design loads are confirmed per project by our structural engineers.

    What we build

    1 of 6

    What we build

    Six services from one regional team, so the people who engineer your frame are the ones who put it up.

    Select a service to open it, or use the arrow keys.

    How a modular steel build runs

    One contract covers every step, from the first site visit to the keys.

    1. Site visit and feasibility

      We survey the lot, check soil, access and flood exposure, and tell you what the site can carry before you spend on design.

    2. Design and structural engineering

      Architecture and steel engineering are done together, so wind loads, openings and services are resolved on paper rather than on site.

    3. Permits and a fixed budget

      We take the drawings through local permitting in each country and give you an itemised budget that the contract holds us to.

    4. Fabrication and foundation, at the same time

      Wall panels and trusses are cut and assembled in our shop while the crew pours the foundation on site.

      This overlap is where most of the 40% time saving comes from. Rain on site doesn't stop work in the shop.
    5. Frame, envelope and fit-out

      The frame is erected in days. Impact glazing, roofing, solar-ready wiring and interiors follow.

    6. Inspection and handover

      Final inspections, a walkthrough with you, and a maintenance guide written for salt air and storm season.

    Recent projects

    Residential and commercial builds across the region.

    Emerald Bay modular residence

    Emerald Bay Modular Residence

    A coastal villa built on a hybrid cold-formed steel frame, with Category 5 impact glazing throughout. Framing was fabricated off-site and the house was complete in 16 weeks.

    Type
    Coastal villa
    Size
    3,400 sq ft
    Structure
    Hybrid cold-formed steel
    Glazing
    Category 5 impact rated
    Build time
    16 weeks
    West Bay Tech and Retail Plaza

    West Bay Tech & Retail Plaza

    A 12,500 sq ft two-storey commercial building with zoned smart cooling, microgrid-ready backup power and street-level retail.

    Palm Grove coastal estate

    Palm Grove Coastal Estate

    A 4,800 sq ft residence with corrosion-resistant steel trusses, home automation and an infinity pool deck.

    Meet the people behind Everlast.

    Design, engineering, steel fabrication, finance and technology, from one team working across four countries.

    Founder & Chief Executive Officer

    Jason A. Smith

    Tell us about your site.

    An engineer from our team will reply within one working day to arrange a site visit.

    Where we buildThe Bahamas, Costa Rica, Dominican Republic and United States
    Phone and WhatsApp+1 (242) 555-0194

    Start a similar project